Crane

Me Model Double Trolley Shipyard Gantry Crane

HENAN NYBON MACHINERY CO., LTD.
  • Certification:RoHS, CE, ISO9001
  • Condition:New
  • Maximum Lifting Weight:50-100t
  • Maximum Lifting Height:25-30m
  • Operation Form:Air Operation+Ground Operation
  • Type:Common Gantry Crane

Base Info

  • Model NO.:ME
  • Main Girder Form:Double Girder
  • Product Name:Me Model Double Trolley Shipyard Gantry Crane
  • Customized Design:Acceptable
  • MOQ:1 Set
  • Transport Package:Wood Carton, Waterproof Plastic Clothes
  • Specification:13*6.0*3.5m
  • Trademark:NYBON
  • Origin:Henan, China
  • HS Code:84261930
  • Production Capacity:3000 Sets,Year

Description

Power source three-Phase A C 50HZ 380V


Main features:

1, Owned multi functions such as single-lift, double-lift, air-turning, and horizontal micro-rotation in the air.

2. There are two kinds of single main beam type and double main beam type for users to choose. To use materials
reasonably, the main beam adopts variable section optimization and design.

3, Rigid legs are available in a single column type and double column type for the user to choose.

4. The upper trolley has double hooks, which are placed on the outer sides of the main beam respectively, but can
be moved individually or simultaneously.

5, Lower trolley has main and vice hooks, placed under the main beam center.

6, The upper and lower trolleys can cross each other's operations.

7, All lifting and travelling mechanism are frequency control.

8. On the rigid leg side, there is a maintenance jib crane on the top of main beam to complete the maintenance
operations of the upper and lower trolleys.

9,In order to facilitate the driver and maintenance personnel on the machine, there is a boarding elevator in the rigid leg.

10. In order to prevent the storm from hitting, there are safe and reliable windproof devices such as rail clamps, ground
anchors and anchor chains.

 

Me Model Double Trolley Shipyard Gantry Crane

  
Me Model Double Trolley Shipyard Gantry Crane

Me Model Double Trolley Shipyard Gantry Crane

Packing & Delivery terms:

1. Hoist and electric parts will be packed by plywood crate, for avoiding the demage from goods crash and impact during
the delivery.

2. Girders and other main parts will be packed by plastic woven cloth, for preventing rust from soppy condition during the
transportation.

3. Only the best transport solution will be taken for saving your cost uttermost on finance, security and time.


Me Model Double Trolley Shipyard Gantry Crane
Me Model Double Trolley Shipyard Gantry Crane


Me Model Double Trolley Shipyard Gantry CraneMe Model Double Trolley Shipyard Gantry Crane  A. How can I get a precise crane offer?Please confirm the specifications below:
  1. Lifting capacity; how many ton?
  2. Lifting height: how many m?
  3. Crane span(the width of inquired crane): How many m?
  4. Crane traveling length; when rail track/runway beam needed, traveling length shall be provided.
  5. Working power; power source at site(unit as voltage, phase and Hz)
  6. Working class: how many hours shoud the crane work/day
B.What operation methods can we choose?
  1. Pendent control ;
  2. Remote control ;
  3. Cabin controtl

C.How to install the crane at our site?
NYBON engineer team will offer you installatiaon guide and training,we can also send our team to your country for
installation.